Skip to content
+44 (0) 1773 860001[email protected]
LinkedinFacebookTwitterYouTube
ECS Engineering Services
ECS Engineering Services
Home
  • Home
  • Company
    • Resources
      • Project Management
      • Mechanical Engineering
      • Electrical Engineering
      • Control & Automation
      • Planned, Preventative and Emergency Maintenance
      • Installation
      • CE Marking Accreditation
    • Framework Agreements
    • Environment
    • Site Services
    • Safety
    • Accreditations
    • Vacancies
  • Water Management
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Pumping stations
    • Lock Gates
    • Composite Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Solar Water Management
  • Water Treatment
    • Waste Water Treatment Plants
    • Archimedes Screw Pumps
    • HyperClassic Mixers
    • Rotex Brush Aerators
    • Vertex Aerators
    • Scum Skimmers
    • Archimedes Screw Generator Repair
  • Construction
    • Fabrication Design & Detailing
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Welded Engineering Assemblies
    • Bridges
    • Composite Bridges
    • Recycled Plastic Structures
  • Power & Industrial
    • Renewable Power Plants
    • Nuclear
  • Resources
    • Brochures
    • Case Studies
    • Newsletters
    • Videos
  • News
  • Contact
 
  • Home
  • Company
    • Resources
      • Project Management
      • Mechanical Engineering
      • Electrical Engineering
      • Control & Automation
      • Planned, Preventative and Emergency Maintenance
      • Installation
      • CE Marking Accreditation
    • Framework Agreements
    • Environment
    • Site Services
    • Safety
    • Accreditations
    • Vacancies
  • Water Management
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Pumping stations
    • Lock Gates
    • Composite Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Solar Water Management
  • Water Treatment
    • Waste Water Treatment Plants
    • Archimedes Screw Pumps
    • HyperClassic Mixers
    • Rotex Brush Aerators
    • Vertex Aerators
    • Scum Skimmers
    • Archimedes Screw Generator Repair
  • Construction
    • Fabrication Design & Detailing
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Welded Engineering Assemblies
    • Bridges
    • Composite Bridges
    • Recycled Plastic Structures
  • Power & Industrial
    • Renewable Power Plants
    • Nuclear
  • Resources
    • Brochures
    • Case Studies
    • Newsletters
    • Videos
  • News
  • Contact
November 3, 2016Leave a commentWater Control

ECS to refurbish East Anglian pumping station to reduce flood risk and improve drainage

ECS Engineering Services has won the contract to redevelop and refurbish the Environment Agency’s Peakirk Pumping Station, near Peterborough, at the junction of the Rivers Welland and Folly. The aims of the project are to improve the whole drainage of the surrounding area and provide improved flood prevention capabilities.

Peakirk Pumping Station, near Peterborough, at the junction of the Rivers Welland and Folly

The site includes three outdoor electrically powered pumps and three further diesel driven pumps in a pump building, all on a metal and concrete bridge straddling the River Welland. The adjacent control room contains the switch gear, power supplies and automatic level controls that keep this station running.

The flood defence system is based on a pair of wooden pointing doors designed to prevent flood waters reaching properties upstream of the pumping station, which ECS is to re-engineer. The doors will be refurbished and their mounting posts replaced. In addition, ECS has proposed a simple mechanical counterbalance system that will be designed and manufactured in house for closing the doors in periods of high water levels.

Gaining access to the pointing doors is an extremely difficult process and has been taken on by ECS as part of this project. The downstream channel isolation has been created using a temporary GEO dam system that is capable of maintaining a water level of over 3m, installed with diving contractors this is the largest dam of its type installed in these conditions in the UK.

Future proofing the site, and leaving the client with a maintainable asset is essential on this type of contract and ECS, in conjunction with its supply chain have provided the client with a fully width adjustable stop log system designed to isolate 3m of water. This rack and pinion driven, coated steel system has been developed to be universal with an operating channel range of 6.8 m to 8.0m, thus enabling the EA to utilise it to maintain other assets in the region.

Similarly, ECS is to replace the existing double automated weed screen cleaner with up to date, modern Landustrie machines that will work in harmony with the rest of the site assets. The new arrangement will consist of a single monorail supporting two grabs for two separate inlets, all controlled by a modern Mitsubishi PLC (programmable logic controller). The system will run automatically to remove debris collecting in front of the screens; overrides will allow an operator to take control for maintenance and test purposes.

To reduce the need for manual handling, ECS is to upgrade the existing overhead manually operated travelling building cranes by installing electrical drives and hoist systems. It will also upgrade the power supply to the pump house and install accessible energy efficient LED lighting to overcome the difficulties of maintaining the current high level fittings.

About the author

Alan Hatch

Related posts
ECS: Maintaining the country’s assets with confidence
April 6, 2023
ECS dives in for British Camp reservoir valve repair
September 30, 2022
Pipework replacement by ECS helps improve reliability at Mythe Water Treatment Works
April 19, 2022
New ECS stainless-steel ballast tanks keep Pillings radial gate open
November 30, 2021
ECS installs UK’s first moulded FRP lock gates
November 17, 2021
ECS installs penstock system to support environment and migrating fish
October 28, 2021
Leave Comment

Cancel reply

Your email address will not be published. Required fields are marked *

Please fill out the CAPTCHA below. *

clear formSubmit

Services
  • Fabrications
  • Water
  • Site Services
  • Environment
Pages
  • Vacancies
  • Contact
  • Modern Slavery Statement
  • Privacy Policy
  • Terms and Conditions
News Categories
  • ECS(202)
  • Environment(40)
  • Fabrications(51)
  • Nuclear(1)
  • Site Services(54)
  • Uncategorized(13)
  • Water Control(123)
Contact Us
Fulwood Road South
Sutton in Ashfield
Nottinghamshire
NG17 2JZ
  • Telephone
    01773 860001
Copyright © ecsengineeringservices.com 2020. All Rights Reserved