Skip to content
+44 (0) 1773 860001[email protected]
LinkedinFacebookTwitterYouTube
ECS Engineering Services
ECS Engineering Services
Home
  • Home
  • Company
    • Resources
      • Project Management
      • Mechanical Engineering
      • Electrical Engineering
      • Control & Automation
      • Planned, Preventative and Emergency Maintenance
      • Installation
      • CE Marking Accreditation
    • Framework Agreements
    • Environment
    • Site Services
    • Safety
    • Accreditations
    • Vacancies
  • Water Management
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Pumping stations
    • Lock Gates
    • Composite Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Solar Water Management
  • Water Treatment
    • Waste Water Treatment Plants
    • Archimedes Screw Pumps
    • HyperClassic Mixers
    • Rotex Brush Aerators
    • Vertex Aerators
    • Scum Skimmers
    • Archimedes Screw Generator Repair
  • Construction
    • Fabrication Design & Detailing
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Welded Engineering Assemblies
    • Bridges
    • Composite Bridges
    • Recycled Plastic Structures
  • Power & Industrial
    • Renewable Power Plants
    • Nuclear
  • Resources
    • Brochures
    • Case Studies
    • Newsletters
    • Videos
  • News
  • Contact
 
  • Home
  • Company
    • Resources
      • Project Management
      • Mechanical Engineering
      • Electrical Engineering
      • Control & Automation
      • Planned, Preventative and Emergency Maintenance
      • Installation
      • CE Marking Accreditation
    • Framework Agreements
    • Environment
    • Site Services
    • Safety
    • Accreditations
    • Vacancies
  • Water Management
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Pumping stations
    • Lock Gates
    • Composite Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Solar Water Management
  • Water Treatment
    • Waste Water Treatment Plants
    • Archimedes Screw Pumps
    • HyperClassic Mixers
    • Rotex Brush Aerators
    • Vertex Aerators
    • Scum Skimmers
    • Archimedes Screw Generator Repair
  • Construction
    • Fabrication Design & Detailing
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Welded Engineering Assemblies
    • Bridges
    • Composite Bridges
    • Recycled Plastic Structures
  • Power & Industrial
    • Renewable Power Plants
    • Nuclear
  • Resources
    • Brochures
    • Case Studies
    • Newsletters
    • Videos
  • News
  • Contact
May 15, 2014Leave a commentECS, Site Services, Water Control

ECS Engineering wins Archimedes screw pump order for NI Water

Managing and maintaining water control facilities are important roles for the Environment Agency (EA) and this work is entrusted to its framework contractors, such as ECS Engineering Services. When the pumps at a site in Matlock, Derbyshire, needed to be replaced the project also required some major building modifications and additional electrical work, something ECS was able to provide via its Site Services Division.

The pumping station is designed to protect areas of Matlock in the event of high water levels on the River Derwent. Bentley Brook joins the Derwent after passing through two sets of lock gates. If the Derwent rises beyond a certain level, the gates are shut to prevent the water increasing the levels in the brook. The water in the brook is diverted through a set of trash screens to the pumps which transfer the water into the Derwent. This system allows the brook water to continue flowing instead of backing up and flooding parts of the town.

The three original pumps had reached the end of their service life, having been in place for over 25 years and have now been replaced with new submersible canister pumps. The pumps used to be housed inside the pump building, but this made for difficult access for maintenance, so the EA decided to have the roof removed and all of the original services re-routed. This change in design would make it possible to use a mobile crane to lift the pumps when required for maintenance.

In order to install the new pumps, the first step was to complete the removal of the roof of the pump room and make the remainder of the building safe and secure. This required both electrical and mechanical engineers to work together to produce a safe environment for the pump engineers tasked with the process of exchanging the pumps.

ECS also installed the new pump controls and associated wiring in the motor control centre (MCC) and assisted in the commissioning of the new pumps. The new pump controls included new starter circuits as well as a new change-over system for the generator supply, which ensures that the pumps will continue to operate, even in the event of a power failure.

Once the pump installation had been completed, ECS installed a new, raised GRP grating floor above the pump locations along with access steps and hand railing. The new flooring is designed to allow safe and easy access to the pump locations while also protecting the supply cables from damage.

During normal river flow conditions, the main pumps are not required, however occasional rainfall starts to fill the wet well and they had to be used to remove this water and pump it into the main river stream. In order to reduce the energy consumption of this task, ECS installed a new, much smaller, submersible pump in the wet well with permanent cast iron pipework. Using a set of conductivity probes, this smaller pump now automatically controls the water level in the wet well during periods of normal river levels, saving energy and unnecessary wear on the larger pumps.

ECS continues to deliver the on-going maintenance contract for the EA on this and many other sites, ensuring that the assets are properly maintained and operating efficiently.

 

ECSDMA045_Knowlston_Place_Pic1
When the pumps at a site in Matlock, Derbyshire, needed to be replaced the project also required some major building modifications and additional electrical work, something ECS was able to provide via its Site Services Division
ECS also installed the new pump controls and associated wiring in the motor control centre (MCC) and assisted in the commissioning of the new pumps

About the author

Martin

Related posts
An ECS and FCS Collaboration Achieves Remarkable Success with Recently Tendered Environment Agency MEICA Framework Agreement
November 15, 2023
ECS renews multiple accreditations and maintains high operational standards
August 18, 2023
ECS wins RoSPA Gold Award for 13th consecutive time
July 26, 2023
Silver Recognition: ECS’ Dedication to the Armed Forces Community
July 12, 2023
Lindhurst Engineering Acquisition: A New Chapter of Success for ECS Engineering Services
July 11, 2023
Node Steelwork: The Backbone of Modern Construction
April 24, 2023
Leave Comment

Cancel reply

Your email address will not be published. Required fields are marked *

Please fill out the CAPTCHA below. *

clear formSubmit

Services
  • Fabrications
  • Water
  • Site Services
  • Environment
Pages
  • Vacancies
  • Contact
  • Modern Slavery Statement
  • Privacy Policy
  • Terms and Conditions
News Categories
  • ECS(202)
  • Environment(40)
  • Fabrications(51)
  • Nuclear(1)
  • Site Services(54)
  • Uncategorized(13)
  • Water Control(123)
Contact Us
Fulwood Road South
Sutton in Ashfield
Nottinghamshire
NG17 2JZ
  • Telephone
    01773 860001
Copyright © ecsengineeringservices.com 2020. All Rights Reserved