Skip to content
+44 (0) 1773 860001[email protected]
LinkedinFacebookTwitterYouTube
ECS Engineering Services
ECS Engineering Services
Home
  • Home
  • Company
    • Resources
      • Project Management
      • Mechanical Engineering
      • Electrical Engineering
      • Control & Automation
      • Planned, Preventative and Emergency Maintenance
      • Installation
      • CE Marking Accreditation
    • Framework Agreements
    • Environment
    • Site Services
    • Safety
    • Accreditations
    • Vacancies
  • Water Management
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Pumping stations
    • Lock Gates
    • Composite Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Solar Water Management
  • Water Treatment
    • Waste Water Treatment Plants
    • Archimedes Screw Pumps
    • HyperClassic Mixers
    • Rotex Brush Aerators
    • Vertex Aerators
    • Scum Skimmers
    • Archimedes Screw Generator Repair
  • Construction
    • Fabrication Design & Detailing
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Welded Engineering Assemblies
    • Bridges
    • Composite Bridges
    • Recycled Plastic Structures
  • Power & Industrial
    • Renewable Power Plants
    • Nuclear
  • Resources
    • Brochures
    • Case Studies
    • Newsletters
    • Videos
  • News
  • Contact
 
  • Home
  • Company
    • Resources
      • Project Management
      • Mechanical Engineering
      • Electrical Engineering
      • Control & Automation
      • Planned, Preventative and Emergency Maintenance
      • Installation
      • CE Marking Accreditation
    • Framework Agreements
    • Environment
    • Site Services
    • Safety
    • Accreditations
    • Vacancies
  • Water Management
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Pumping stations
    • Lock Gates
    • Composite Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Solar Water Management
  • Water Treatment
    • Waste Water Treatment Plants
    • Archimedes Screw Pumps
    • HyperClassic Mixers
    • Rotex Brush Aerators
    • Vertex Aerators
    • Scum Skimmers
    • Archimedes Screw Generator Repair
  • Construction
    • Fabrication Design & Detailing
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Welded Engineering Assemblies
    • Bridges
    • Composite Bridges
    • Recycled Plastic Structures
  • Power & Industrial
    • Renewable Power Plants
    • Nuclear
  • Resources
    • Brochures
    • Case Studies
    • Newsletters
    • Videos
  • News
  • Contact
December 15, 2015ECS, Water Control

ECS renews sluice automation equipment for EA

As the Environment Agency (EA) continues its programme to upgrade water control structures on the River Lee, it has contracted ECS Engineering Services to replace the actuators and gearboxes on the sluice gates at Rammey Marsh. The project also delivered improved automation and reliability which reduced maintenance costs.

Located in Waltham Abbey, Essex, the Rammey Marsh sluice gates form part of the extensive flood prevention equipment on and around the River Lee. Originally built as part of a flood alleviation scheme, the three sluice gates form part of a network of sluices and weirs designed to maintain the water level in the flood relief channel and associated lakes, but also allow flood water to be discharged towards the Thames when necessary.

Originally built in the 1950s, the drive systems for the sluice gates, each of which had reached the end of its serviceable life and the EA set in place a project not only to replace them but also to improve the automated control system at the same time. The motors, gearboxes, brake assemblies and hand wheels all needed to be replaced with the new components connecting to the existing main shaft which held the wire ropes used to raise and lower the sluice doors.

ECS designed the new drive system to incorporate Rotork IQ35 actuators that were connected to 90°gearboxes. The new actuators have an IP68 rating to ensure optimum performance in this application and they are also fitted with additional 4-20 mA relay outputs that provide a signal for the current position of the sluice gate. This information can be transmitted back to the central control point to provide vital data on the status of the sluice structure.

The renovation project involved design and fabrication work to position the new drive mechanisms in exactly the right place for the connection to the main drive shaft above each sluice gate. In addition ECS created some additional access platforms and hand railing to ensure that EA engineers can safely operate the hand wheels without the need for temporary access equipment.

The original motor control centre (MCC) was retained but the ECS electrical engineers modified the control wiring of each sluice gate to accommodate the new position signals and the more modern actuator controls. As each drive system was completed it was tested and commissioned before work started on the next sluice gate. In this way the EA maintained operational control of two sluice gates at all times, which is sufficient for the day to day operation of the site.

Jamie Wesley, Commercial Manager, Water Control Division, explains: “This contract forms part of our on-going commitment to delivering projects for the EA across the UK. As a framework contractor for the EA, ECS is trusted to deliver the skills and expertise required to design, fabricate and install entire projects safely and on time. This project required a wide range of skills including fabrication, electrical control engineering and mechanical design work, all areas in which ECS has considerable experience.”

ECSDMA131_Rammey_Sluice_Gates_Pic1.jpg
Newly installed Rotork 1 and fabricated gate access and railings
ECSDMA131_Rammey_Sluice_Gates_Pic2.jpg
Installation showing Rotork linked to sluice gate opening winch
ECSDMA131_Rammey_Sluice_Gates_Pic3.jpg
Over view of the sluice gates showing the 3 gate opening winches

About the author

Martin

Related posts
An ECS and FCS Collaboration Achieves Remarkable Success with Recently Tendered Environment Agency MEICA Framework Agreement
November 15, 2023
ECS renews multiple accreditations and maintains high operational standards
August 18, 2023
ECS wins RoSPA Gold Award for 13th consecutive time
July 26, 2023
Silver Recognition: ECS’ Dedication to the Armed Forces Community
July 12, 2023
Lindhurst Engineering Acquisition: A New Chapter of Success for ECS Engineering Services
July 11, 2023
Node Steelwork: The Backbone of Modern Construction
April 24, 2023
Services
  • Fabrications
  • Water
  • Site Services
  • Environment
Pages
  • Vacancies
  • Contact
  • Modern Slavery Statement
  • Privacy Policy
  • Terms and Conditions
News Categories
  • ECS(202)
  • Environment(40)
  • Fabrications(51)
  • Nuclear(1)
  • Site Services(54)
  • Uncategorized(13)
  • Water Control(123)
Contact Us
Fulwood Road South
Sutton in Ashfield
Nottinghamshire
NG17 2JZ
  • Telephone
    01773 860001
Copyright © ecsengineeringservices.com 2020. All Rights Reserved