ECSDMA415_Bagnor Bridge_Pic1

Footbridge innovations make installation easy and ensure long life

Footbridge innovations make installation easy and ensure long life A new footbridge providing access to an Environment Agency groundwater pumping station near Newbury in Berkshire has won the praise of local residents because of the minimal disturbance during installation. The facts that it has little visual impact and will require hardly any maintenance during its…

ECS manufacturing and site teams ready to carry out essential engineering work

ECS manufacturing and site teams ready to carry out essential engineering work ECS Engineering Services has reiterated that it will continue to provide core engineering services to customers requiring essential works during the COVID-19 pandemic. This includes providing critical support to utilities and infrastructure. Clark Williamson, Contracts Director at ECS, said: “In light of the…

26 tonne Erith Bridge fabricated by ECS Engineering Services

26 tonne Erith Bridge fabricated by ECS Engineering Services A new steel bridge has been constructed by ECS Engineering Services’ fabrications department, weighing in at 26 tonnes. The Erith Bridge has been installed at a supermarket distribution centre in North London, spanning a pond for the convenience of cyclists and pedestrians. ECS’ fabrications department located…

ECS Engineering Services installs FRP bridge to span the River Brent

ECS Engineering Services installs FRP bridge to span the River Brent ECS Engineering Services has installed a public access bridge in Greenford, West London, as part of the River Brent Project regeneration scheme. Manufactured in fibre reinforced polymer (FRP) for long term durability and minimal environmental impact, the bridge was delivered on schedule and installed…