Skip to content
+44 (0) 1773 860001info@ecseng.co.uk
LinkedinFacebookTwitterYouTube
ECS Engineering Services
ECS Engineering Services
Home
  • Home
  • Our Company
    • Resources
    • Safety
    • Framework Agreements
    • Accreditations
    • Vacancies
  • Fabrications
    • Fabrication Design & Detailing
    • Welded Engineering Assemblies
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Bridges
    • Renewable Power Plants
    • Nuclear
    • Installation
    • CE Marking Accreditation
  • Water Control
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Waste Water Treatment Plants
    • Landustrie
      • Archimedes Screw Generator Repair
  • Site Services
    • Project Management
    • Mechanical Engineering
    • Electrical Engineering
    • Control & Automation
    • Planned, Preventative and Emergency Maintenance
  • Environment
    • Composite Bridges
    • Composite Lock Gates
    • Composite Stoplogs
    • Recycled Plastic Structures
  • Literature
    • Brochures
    • Case Studies
    • Newsletters
  • Videos
  • News
  • Contact
 
  • Home
  • Our Company
    • Resources
    • Safety
    • Framework Agreements
    • Accreditations
    • Vacancies
  • Fabrications
    • Fabrication Design & Detailing
    • Welded Engineering Assemblies
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Bridges
    • Renewable Power Plants
    • Nuclear
    • Installation
    • CE Marking Accreditation
  • Water Control
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Waste Water Treatment Plants
    • Landustrie
      • Archimedes Screw Generator Repair
  • Site Services
    • Project Management
    • Mechanical Engineering
    • Electrical Engineering
    • Control & Automation
    • Planned, Preventative and Emergency Maintenance
  • Environment
    • Composite Bridges
    • Composite Lock Gates
    • Composite Stoplogs
    • Recycled Plastic Structures
  • Literature
    • Brochures
    • Case Studies
    • Newsletters
  • Videos
  • News
  • Contact

Daily Archives: November 17, 2021

You are here:
  1. Home
  2. 2021
  3. November
  4. 17

ECS installs UK’s first moulded FRP lock gates

ECS Engineering Services has installed the UK’s first ever set of moulded fibre reinforced polymer (FRP) lock gates on the River Thames at Sunbury Dry Dock.

November 17, 2021Leave a commentECS, Environment, Fabrications, Water ControlBy Selina Price
Copyright © ecsengineeringservices.com 2020. All Rights Reserved