Skip to content
+44 (0) 1773 860001info@ecseng.co.uk
LinkedinFacebookTwitterYouTube
ECS Engineering Services
ECS Engineering Services
Home
  • Home
  • Our Company
    • Resources
    • Safety
    • Framework Agreements
    • Accreditations
    • Vacancies
  • Fabrications
    • Fabrication Design & Detailing
    • Welded Engineering Assemblies
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Bridges
    • Renewable Power Plants
    • Nuclear
    • Installation
    • CE Marking Accreditation
  • Water Control
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Waste Water Treatment Plants
    • Landustrie
      • Archimedes Screw Generator Repair
  • Site Services
    • Project Management
    • Mechanical Engineering
    • Electrical Engineering
    • Control & Automation
    • Planned, Preventative and Emergency Maintenance
  • Environment
    • Composite Bridges
    • Composite Lock Gates
    • Composite Stoplogs
    • Recycled Plastic Structures
  • Literature
    • Brochures
    • Case Studies
    • Newsletters
  • Videos
  • News
  • Contact
 
  • Home
  • Our Company
    • Resources
    • Safety
    • Framework Agreements
    • Accreditations
    • Vacancies
  • Fabrications
    • Fabrication Design & Detailing
    • Welded Engineering Assemblies
    • Primary Structural Steelwork
    • Secondary Metalwork
    • Bridges
    • Renewable Power Plants
    • Nuclear
    • Installation
    • CE Marking Accreditation
  • Water Control
    • Large Water Control Structures
    • Archimedes Screw Pumps
    • Lock Gates
    • Trash Screens and Cleaners
    • Flow Control Installations
    • Waste Water Treatment Plants
    • Landustrie
      • Archimedes Screw Generator Repair
  • Site Services
    • Project Management
    • Mechanical Engineering
    • Electrical Engineering
    • Control & Automation
    • Planned, Preventative and Emergency Maintenance
  • Environment
    • Composite Bridges
    • Composite Lock Gates
    • Composite Stoplogs
    • Recycled Plastic Structures
  • Literature
    • Brochures
    • Case Studies
    • Newsletters
  • Videos
  • News
  • Contact
November 27, 2014ECS, Environment, Water Control

Revolutionary material for lock gates comes to the UK

Across the country lock gates perform a vital role in allowing boats to travel along the river and canal network but maintaining the ageing infrastructure is an extensive and costly operation. Traditionally made from wood and steel, lock gates require regular inspections and replacement costs can be very high. ECS Engineering Services is launching an innovative technology which delivers a low maintenance, lightweight and very durable alternative.

For hundreds of years lock gates have been used to bypass obstacles along navigable stretches of river and canal such as weirs, dams or rapids and as such they need to be properly maintained to ensure their continued use. Historic methods of construction have involved wood which may later be reinforced with steel. This type of design provides the necessary strength but it is prone to rotting, corrosion and is very heavy.

Modern design techniques and materials technology have been developed in the Netherlands to construct strong, lightweight and durable structures using fibre reinforced polymers (FRP). With more than 300 projects completed, this proven technology is now being introduced to the UK by ECS that has considerable experience in designing and installing water control structures.

The material technology, known as InfraCoreĀ® Inside, has a design life of 100 years and comes with a 50 year warranty, providing peace of mind that any new lock gates will not rot or corrode and also provide excellent resistance to water, salt and UV radiation. The lightweight construction also minimises the wear and tear on hinges, reducing maintenance intervals and costs.

Lock gates manufactured using InfraCoreĀ® Inside can be made to measure with a reduced lead time and the possibility to specify any colour. In addition each set of gates can be pre-fabricated with a frame, ready to be cast into a reinforced concrete lock chamber or with a non-slip wear surface and an FRP hand-railing system.

ECS Engineering is now offering its expertise in design, fabrication and installation to deliver bespoke lock gates constructed from FRP as an alternative for the many installations that it completes for clients including water utilities, local councils, the Canal & River Trust and the Environment Agency.

 

ECSDMA082_InfraCore_Lock_Gates_pic1_web
ECS Engineering Services is launching an innovative technology which delivers a low maintenance, lightweight and very durable lock gate alternative
ECSDMA082_InfraCore_Lock_Gates_pic2_web
Lock gates manufactured using InfraCoreĀ® Inside can be made to measure with a reduced lead time and the possibility to specify any colour
ECSDMA082_InfraCore_Lock_Gates_pic3_web
The lightweight construction also minimises the wear and tear on hinges, reducing maintenance intervals and costs

About the author

Martin

Related posts
ECSDMA443_Severn_Trent_Pic1
Start your engineering story
October 24, 2022
ECS dives in for British Camp reservoir valve repair
September 30, 2022
ECS upgrades River Glen level sensor with solar powered system
August 19, 2022
ECS expands fabrication capabilities with new CNC machine
August 4, 2022
ECS nominated for Technical Innovation of the Year at The London Construction Awards
August 1, 2022
New job opportunities highlight growth at ECS Engineering Services
May 31, 2022
Services
  • Fabrications
  • Water
  • Site Services
  • Environment
Pages
  • Vacancies
  • Contact
  • Privacy Policy
  • Terms and Conditions
News Categories
  • ECS(194)
  • Environment(39)
  • Fabrications(49)
  • Site Services(53)
  • Uncategorized(5)
  • Water Control(122)
Contact Us
Fulwood Road South
Sutton in Ashfield
Nottinghamshire
NG17 2JZ
  • Telephone
    01773 860001
Copyright © ecsengineeringservices.com 2020. All Rights Reserved